Skip to content

JFK Millennium Partners Selects Materna IPS to Provide State-of-the-art Hybrid Self-Service Bag Drop Equipment at new JFK Terminal 6

Biometric-enabled equipment will allow T6 passengers to check their bags in less than 30 seconds, providing a superior check-in experience

Aug. 01, 2024: New York, NY and Orlando, Florida – JFK Millennium Partners (JMP), the company selected by the Port Authority of New York & New Jersey (PANYNJ) to build and operate the new $4.2 billion Terminal 6 (T6) at John F. Kennedy International Airport — part of the PANYNJ’s broader $19 billion redevelopment of JFK airport, and Materna IPS, a leading supplier of automated passenger handling solutions for airlines and airports worldwide, today announced that Materna IPS will provide its state-of-the-art hybrid self-service bag drop (SSBD) equipment for the new Terminal 6, representing one of the largest and most extensive self-bag drop installations in the United States and for Materna IPS in the Americas.

Materna’s new Flex.Go hybrid bag drop system will make its JFK debut at the new Terminal 6 when it opens to passengers in 2026. It is also currently in use at the five largest U.S. airports and in numerous airports overseas. Terminal 6 will deploy the new Materna system throughout its check-in area as a replacement for traditional check-in positions. The biometric-enabled equipment will allow airline passengers (1) to verify their identification (2), drop their bags on the belt and go in less than 30 seconds. For passengers needing additional assistance, or airlines who are not yet biometric-ready in the United States, airline staff can also operate the Materna systems – making their hybrid capability ideal.

“The Materna system perfectly aligns with our goal to create a state-of-the-art terminal that is digital first — while also offering our guests choice,” said Steve Thody, CEO, JFK Millennium Partners. “While some guests may prefer to utilize the self-service bag drop option, with its multiple languages and overall ease of use – others may still want support from an agent. The ability to offer our guests both options in an elevated check-in experience is what we’re most excited about,” Thody added.

Gary McDonald, President, Materna IPS Americas said, “We are delighted to be partnering with JFK Millennium Partners and the Port Authority of New York & New Jersey at such an exciting time in the airport’s history to bring the best in innovation to their passengers, airline partners, and agents. Materna IPS is already known throughout the international aviation community, and we have delivered multiple notable projects throughout the U.S. To be awarded this contract at JFK Terminal 6 is the icing on the cake. We are so excited for JFK’s future and look forward to celebrating new milestones with this legendary airport.

(1) Depending on the airline; not every airline is currently equipped to offer biometric services.
(2) Driver’s license or passport

###

About Materna IPS
One of the most renowned suppliers for airports and airlines around the world, Materna IPS (Intelligent Passenger Solutions) delivers solutions for automated passenger handling at airports. The company’s range of services includes hardware and software implementations as well as service and maintenance. Its international offices in the U.S., Canada, Europe, and India enable Materna IPS to provide its customers with individual support and to respond quickly and professionally to market requirements.

About JFK Millennium Partners
Terminal 6 is an award-winning public-private partnership between the Port Authority of New York and New Jersey and JFK Millennium Partners – a consortium that includes Vantage Group, an industry leading investor, developer and manager of award-winning global airport projects, including LaGuardia Airport’s Terminal B; American Triple I, a certified minority-owned investor, owner, developer and manager of infrastructure assets; RXR, an innovative New York real estate investor and developer; and JetBlue Airways, New York’s hometown airline. When complete, Terminal 6 will connect seamlessly with Terminal 5 to create an anchor terminal on JFK International Airport’s north side. For more information, visit anewjfk.com/jmp-terminal6/

Media Contacts:

JFK Millennium Partners
Jennifer Janzen, Director Communications
JJanzen@vantageairportgroup.com

Materna IPS USA
Gary McDonald, President, Americas
gary.mcdonald@materna.group
619-724-9280
www.materna-ips.com

Materna IPS
Jennifer Schade
Head of Marketing
jennifer.schade@materna.group
+49 (173) 7929259

Port Authority and JFK Millennium Partners Announce Selection of Acclaimed Artists to Create Permanent Commissions at John F. Kennedy International Airport’s New Terminal 6

18 Inspirational Art Installations Will Feature Artists from New York and Beyond, Supporting Port Authority and JFK Millennium Partners’ Vision to Transform the Passenger Experience at JFK; Sculptures, Suspended Installations, Wall Works, and Glass Mosaic Floor Medallions will Create a Unique New York Sense of Place; Curated by Public Art Fund, Artists Selected by Committee from Port Authority, JFK Millennium Partners, and Arts Community

Photos of the Artists are Available Here; Construction Photos and Renderings of the New Terminal 6 are Available Here

 

FOR IMMEDIATE RELEASE
July 16, 2024

Contact:
The Port Authority of New York and New Jersey
212-435-7777
Press@panynj.gov

JFK Millennium Partners
Jennifer Janzen, Director Communications
JJanzen@vantageairportgroup.com

Public Art Fund
Robin Carol, Communications Director
rcarol@publicartfund.org

The Port Authority of New York and New Jersey and JFK Millennium Partners (JMP), the company selected to build and operate the highly anticipated $4.2 billion Terminal 6 (T6) at John F. Kennedy International Airport, today announced that 18 artists have been selected to debut new public art commissions when the terminal opens to passengers in 2026. The art program is led by Public Art Fund, the independent nonprofit organization dedicated to art in public spaces. The featured artists, including 10 from New York City, will capture the spirit of New York with a diverse range of artworks that will be seamlessly integrated into the terminal. Sculptures, suspended installations, wall works, and glass mosaic floor medallions will create a unique New York sense of place.

The project supports the Port Authority’s vision to create a world-class passenger experience at JFK, as it has done at the award-winning, internationally recognized terminals at the new LaGuardia Airport and Newark Liberty International Airport’s Terminal A, through inspirational public art, operational excellence, 21st century technology and world-class functionality.

The new Terminal 6 is a key component of the Port Authority’s $19 billion transformation of JFK into a world-class gateway, with two new terminals; two expanded and modernized terminals; a new ground transportation center; and an entirely new simplified roadway network.

“Public art that is inspiring and evocative of our region is an essential part of the Port Authority’s strategy to create world-class airports that are becoming destinations in their own right,” said Port Authority Executive Director Rick Cotton. “Just as we have done at LaGuardia and at Newark-Liberty’s Terminal A, the public art at JFK’s new Terminal 6 will dazzle travelers and help create a sense of place unique to New York.”

“These remarkable artists will bring the unique spirit of our region to the new JFK Terminal 6, welcoming international visitors and locals alike,” said Port Authority Chairman Kevin O’Toole. “We applaud the creative vision of these talented artists and look forward to seeing their creative works transform the terminal.”

“Art brings visitors from across the world to New York City, and our new international gateway at JFK will be an art destination in and of itself,” said George Casey, chair of the board of JFK Millennium Partners and chair and CEO of Vantage Group. “Stepping into the new Terminal 6, visitors will instantly feel the vibrancy of the city’s cultural life reflected in this captivating range of artworks.”

“Art takes a starring role at the new Terminal 6. Walls, floors, ceilings and volumes will all be enriched with architecturally integrated, site-specific commissions by some of the most extraordinary artists of our time,” said Nicholas Baume, artistic & executive director of Public Art Fund. “Like Terminal 6 and New York itself, the reach of the art program is global, featuring artists from near and far, from groundbreaking, emerging voices to senior, celebrated figures.”

Information on the selected artists are provided below:

Nina Chanel Abney
b. 1982, Harvey, Ill.
Lives in Cold Spring, N.Y.

Charles Gaines
b. 1944, Charleston, S.C.
Lives in Los Angeles

Kambui Olujimi
b. 1976, Brooklyn, N.Y.
Lives in Queens, N.Y.

Nevin Aladağ
b. 1972, Van, Turkey
Lives in Berlin

Sky Hopinka
b. 1984, Ferndale, Wash.
Lives in Brooklyn, N.Y.

GaHee Park
b. 1985, Seoul, South Korea
Lives in Montreal

Candida Alvarez
b. 1955, Brooklyn, N.Y.
Lives in Chicago and Baroda, Mich.

Shara Hughes
b. 1981, Atlanta
Lives in Brooklyn, N.Y.

Uman
b. 1980, Somalia
Lives in Roseboom, N.Y.

Felipe Baeza
b. 1987, Guanajuato, Mexico
Lives in Brooklyn, N.Y.

Laure Prouvost
b. 1978, Croix, France
Lives in Brussels

Charline von Heyl
b. 1960, Mainz, Germany
Lives in Manhattan, N.Y., and Marfa, Texas

Kerstin Brätsch
b. 1979, Hamburg, Germany
Lives in Brooklyn, N.Y., and Berlin

Barbara Kruger
b. 1945, Newark, N.J.
Lives in Los Angeles and New York

Dyani White Hawk
b. 1976, Madison, Wis.
Lives in Minneapolis

Teresita Fernandez
b. 1968, Miami
Lives in Brooklyn, N.Y.

Eddie Martinez
b. 1977, Groton, Conn.
Lives in Brooklyn, N.Y.

Haegue Yang
b. 1971, Seoul, South Korea
Lives in Berlin and Seoul

Public Art Fund will work collaboratively with the selected artists and key stakeholders to develop and execute public art commissions in a range of spaces, scheduled to open along with the terminal. JFK Millennium Partners is developing Terminal 6 in two phases, with the opening of the first section in 2026 and construction completion in 2028. The selected artists work in a variety of mediums and represent both local neighborhoods as well as national and international communities.

About Public Art Fund
As the leader in its field, Public Art Fund brings dynamic contemporary art to a broad audience in New York City and beyond by mounting ambitious free exhibitions of international scope and impact that offer the public powerful experiences with art and the urban environment. More information at publicartfund.org.

About JFK Millennium Partners
Terminal 6 is an award-winning public-private partnership between the Port Authority of New York and New Jersey and JFK Millennium Partners – a consortium that includes Vantage Group, an industry leading investor, developer and manager of award-winning global airport projects, including LaGuardia Airport’s Terminal B; American Triple I, a certified minority-owned investor, owner, developer and manager of infrastructure assets; RXR, an innovative New York real estate investor and developer; and JetBlue Airways, New York’s hometown airline. When complete, Terminal 6 will connect seamlessly with Terminal 5 to create an anchor terminal on JFK International Airport’s north side.

About the Port Authority’s $30 Billion Airport Transformations
The Port Authority of New York and New Jersey has embarked on an historic $30 billion transformation of the region’s three major airports – LaGuardia, Newark Liberty and JFK. At JFK, the Port Authority is investing $19 billion through public-private partnerships – with $15 billion funded privately – to transform the airport into a worldclass gateway, with new terminals, modernized facilities, a completely rebuilt roadway network, and a new ground transportation center. At the new LaGuardia, the $8 billion public-private partnership has received global accolades, including the new Terminal B’s Prix Versailles from UNESCO for Best New Terminal in the World honor and the first 5-star rating in the nation from the prestigious global aviation rating agency Skytrax. An airport-wide renaissance of Newark Liberty International Airport is underway, with a new $2.7 billion, award-winning Terminal A that opened in January 2023, the planned full replacement of Newark Liberty’s outdated AirTrain system and the creation of the EWR Vision Plan that will serve as a framework for future development.

###

The Port Authority of New York and New Jersey is a bi-state agency that builds, operates, and maintains many of the most important transportation and trade infrastructure assets in the country. For over a century, the agency’s network of major airports; critical bridges, tunnels and bus terminals; a commuter rail line; and the busiest seaport on the East Coast has been among the most vital in the country – transporting hundreds of millions of people and moving essential goods into and out of the region. The Port Authority also owns and manages the 16-acre World Trade Center campus, which today welcomes tens of thousands of office workers and millions of annual visitors. The agency’s historic $37 billion 10-year capital plan includes unprecedented transformation of the region’s three major airports – LaGuardia, Newark Liberty and JFK – as well as an array of other new and upgraded assets, including the $2 billion renovation of the 90-year-old George Washington Bridge. The Port Authority’s annual budget of $9.3 billion includes no tax revenue from either the states of New York or New Jersey or from the City of New York. $2 billion renovation of the 90-year-old George Washington Bridge. The Port Authority’s annual budget of $9.3 billion includes no tax revenue from either the states of New York or New Jersey or from the City of New York. The agency raises the necessary funds for the improvement, construction or acquisition of its facilities primarily on its own credit. For more information, visit www.panynj.gov or check out the Now Arriving blog.

Vantage Group Appoints Karen Ali Chief Operating Officer at JFK Millennium Partners

Ali Joins the Senior Leadership Team Managing Terminal 7 and Developing a New World-Class Terminal 6 at JFK Airport

Queens, New York; July 15, 2024: Vantage Group today announced the appointment of Karen Ali as Chief Operating Officer at JFK Millennium Partners (JMP), the Vantage-led company selected by the Port Authority of New York and New Jersey (PANYNJ) to manage JFK Terminal 7 and lead the development and operation of a new JFK Terminal 6, part of the PANYNJ’s $19 billion transformation of JFK airport. Ali joins Vantage’s senior leadership team at JFK with nearly 20 years of experience in operations management, project leadership, and business transformation across a range of sectors, including aviation.

Reporting to Steve Thody, CEO of JMP, Ali will develop and deliver a world-class plan that prioritizes operational excellence, guest experience, and financial performance at the existing Terminal 7, and at the new Terminal 6 when its first gates open to passengers in 2026. Key responsibilities include leading the delivery of outstanding safety, security and operational performance, delivering an exceptional and seamless experience to all project stakeholders, maximizing commercial revenue through aeronautical and nonaeronautical programs, and implementing processes and driving metrics for JMP and its partners.

“It’s an exciting time to join our Vantage Group-JMP team as we enter a pivotal stage in T6’s development while continuing to manage a very active and thriving Terminal 7 operation,” said Steve Thody, CEO, JFK Millennium Partners. “Karen’s extensive experience in operations management and business growth are an excellent fit for our $4.2 bn T6 transformation, and we couldn’t be happier to have her onboard.”

“We warmly welcome Karen into her new role as COO at Vantage’s latest airport terminal transformation,” said George Casey, Vantage Group Chair and CEO, and Board Chair, JFK Millennium Partners. “Karen joins a growing and dynamic group of seasoned senior leaders that are transforming transportation experiences at Vantage Group’s airport terminals, in the New York market and beyond.”

“I am excited to join the Vantage and JFK Millennium Partners team as we create a world-class new Terminal 6 at JFK,” said Karen Ali, Chief Operating Officer, JFK Millennium Partners. “I look forward to contributing to the existing operational excellence and creating innovative guest experiences that will become hallmarks of our future 1.2 million square foot terminal.”

A key member of JMP’s senior leadership team, Karen will oversee terminal operations, customer experience, budget and capital projects, risk management, and people leadership. She will also serve as a critical liaison during the Terminal 6 construction phase, collaborating with capital development and construction teams to ensure a smooth transition from old to new facilities, including coordination, testing, commissioning, and implementation.

An accomplished senior professional, Ali has held various senior management positions over nearly a decade-long period at WestJet, including Regional Operations Manager for the airline’s international operations which included the New York airports. Additionally, as Director of Operations for Lynx Air, Ali implemented and oversaw all systems, processes, workflows, and procedures during the airline’s start-up phase. Ali most recently was COO at Avi & Co., a luxury watch retailer, where she led ecommerce, logistics, sales, and marketing strategies, increasing profitability and business performance.

###

About Vantage Group
Vantage Group is a global leader in airport and transportation investment, development, management, and advisory services. Since 1994, Vantage’s corporate and network-wide team has managed an award-winning portfolio, building strong partnerships that integrate global expertise and local know-how to solve complex transportation challenges at every network location. Over three decades, Vantage has built a track record of creating customized solutions to transform airports and transportation centers that benefit the passengers, stakeholders, and communities they serve. Vantage is a wholly owned strategic platform of Investcorp Corsair Infrastructure Partners for capital deployment in the airport and transportation sectors. Visit vantagegroup.com to learn more.

About JFK Terminal 6 Currently under construction at John F. Kennedy International Airport, and part of the Port Authority of New York & New Jersey’s $19 billion redevelopment of JFK airport, Terminal 6 is being developed in two phases, with the first five gates opening in early 2026 and construction completion expected by 2028. New York City-inspired retail, dining options and amenities totaling nearly 100,000 square feet will create a unique New York sense of place. Terminal 6 airlines and their passengers will enjoy a boutique-style, world-class terminal that is digital-first, efficient and full of the latest passenger conveniences, technology and amenities, including:

  • 10 gates, of which nine will accommodate widebody aircraft
  • Less than 5-minute average walking distance from the TSA security screening exit to gates
  • State-of-the-art automated baggage system, customs/border control facilities, and the latest TSA screening technologies
  • One of the longest departures curbs at JFK, with airline-branded passenger drop-off zones
  • Up to five airline lounges, in addition to a new arrivals lounge
  • Digital concierge services • A new ground transportation center
  • A curated collection of New York City-inspired artwork featuring local and international artists, curated by the Public Art Fund in partnership with JMP and the Port Authority of New York & New Jersey
  • Sustainably sourced building materials, rooftop solar power, and energy efficient systems and operating practices throughout the Terminal
  • Sustainability certifications for LEED (silver or gold), Envision and SITES underway

About JFK Millennium Partners
Terminal 6 is an award-winning public-private partnership between the Port Authority of New York & New Jersey and JFK Millennium Partners – a consortium that includes Vantage Group, an industry leading investor, developer and manager of award-winning global transportation projects, including LaGuardia Airport’s Terminal B; American Triple I, a certified minority-owned investor, owner, developer, and manager of infrastructure assets; RXR, an innovative New York real estate investor and developer; and JetBlue Airways, New York’s hometown airline. When complete, Terminal 6 will connect seamlessly with Terminal 5 to create an anchor terminal on JFK International Airport’s north side. For more information, visit https://www.anewjfk.com/jmp-terminal6/

For more information:
Vantage Group Media Relations
media_relations@vantagegroup.com

JFK Millennium Partners
Jennifer Janzen, Communications Director
JJanzen@vantagegroup.com

Read the full interview in Airport Voice’s June 2024 issue

Steve Thody, CEO of JFK Millennium Partners

by Jeff Yapalater

Read the full interview in Airport Voice’s June 2024 issue: Steve Thody Interview.

Cathay Pacific to make Terminal 6 its new home at JFK

Airline will be among the first carriers to operate from the new world-class Terminal 6 beginning in 2026, bringing its world-renowned Cathay Pacific lounge to JFK Airport

 

FOR IMMEDIATE RELEASE 

Contact:  JFK Millennium Partners
Jennifer Janzen 
929-625-4216
JJanzen@vantageairportgroup.com   

Cathay Pacific
Ayesha Minty-Jacob
604-219-3778
Ayesha_mintyjacob@cathaypacific.com  

New York and Hong Kong – June 26, 2024 – JFK Millennium Partners (JMP), the company selected by the Port Authority of New York & New Jersey to build and operate John F. Kennedy International Airport’s new state-of-the-art Terminal 6, and award winning, Hong Kong-based carrier Cathay Pacific, have announced an agreement for the airline to operate from Terminal 6 when the first five gates open to passengers in early 2026. In addition, Cathay Pacific will open a nearly 10,000 square foot lounge at Terminal 6 – its first dedicated lounge in the New York market and its second in the United States along with San Francisco International Airport. Cathay Pacific customers can also look forward to Terminal 6’s digital-first, boutique guest experience, with a less than 5-minute average walk from the TSA security checkpoint exit to its gates.   

The new Terminal 6 is a key component of the Port Authority of New York and New Jersey’s $19 billion transformation of JFK Airport into a world-class gateway, with two new terminals, two expanded and modernized terminals, a new ground transportation center and an entirely new, simplified roadway network.

“We are thrilled to partner with a world-renowned carrier like Cathay Pacific, who shares our vision and commitment to an outstanding guest experience,” said Steve Thody, CEO, JFK Millennium Partners. “We can’t wait to welcome Cathay Pacific’s passengers to our world-class T6 facility, and we look forward to a long and successful partnership,” Thody added.

Cathay Pacific Senior Vice President, Americas Chris van den Hooven said: “This represents a huge milestone in Cathay Pacific’s 28 years of connecting New York with our home, Hong Kong and from 1 July it will be 20 years since we commenced our regular non-stop service.  It has long been our ambition to provide our customers a signature Cathay Pacific airport experience at JFK. We are delighted about our partnership with JFK Millennium Partners, which will make this dream a reality.”  

Cathay Pacific General Manager Customer Experience and Design Vivian Lo said: “New York JFK is among the top locations in our global lounge strategy. We are truly excited by this opportunity to bring the signature Cathay Pacific lounge experience to our premium customers at this important port in our network. This new lounge will feature a number of exciting developments that will put it at the forefront of our lounge proposition, and we look forward to sharing more details with our customers at the appropriate time.” 

 Cathay Pacific has been a pioneer in connecting New York and Hong Kong since its inaugural flights in 1996, which initially made a stop in Vancouver. On July 1, 2004, a significant advancement occurred as the airline launched regular scheduled non-stop services, solidifying its reputation as one of the most established and longest-serving Asian airlines in North America. Celebrating two decades of continuous non-stop operations this year, Cathay Pacific’s flights have been instrumental in fostering enhanced connectivity between two of the world’s most dynamic cities. 

Today, Cathay Pacific operates three flights per day from JFK Terminal 8 to Hong Kong using Airbus A350 and Boeing 777 widebody aircraft. One of only a few Skytrax 5-star rated airlines in the world, Cathay Pacific joins other premium international carriers in choosing the new Terminal 6 as their future home at JFK airport. 

On March 31, 2024, Cathay Pacific reinstated its legendary First class service from JFK to Hong Kong International Airport (HKG), furthering the airline’s commitment to the North American market and providing a superior long-haul flight experience between two of the world’s most important financial centers. 

About JFK Terminal 6 

Currently under construction at John F. Kennedy International Airport, and part of the Port Authority of New York & New Jersey’s $19 billion redevelopment of JFK airport, Terminal 6 is being developed in two phases, with the first five gates opening in early 2026 and construction completion expected by 2028. New York City-inspired retail, dining options and amenities totaling nearly 100,000 square feet will create a unique New York sense of place. Terminal 6 airlines and their passengers will enjoy a boutique-style, world-class terminal that is digital–first, efficient and full of the latest passenger conveniences, technology and amenities, including:  

  • 10 gates, of which nine will accommodate widebody aircraft 
  • Less than 5 minute average walking distance from the TSA security screening exit to gates  
  • State-of-the-art automated baggage system, customs/border control facilities, and the latest TSA screening technologies 
  • One of the longest departures curbs at JFK, with airline-branded passenger drop-off zones 
  • Up to five airline lounges, in addition to a new arrivals lounge 
  • Digital concierge services  
  • A new ground transportation center   
  • A curated collection of New York City-inspired artwork featuring local and international artists, curated by the Public Art Fund in partnership with JMP and the Port Authority of New York & New Jersey 
  • Sustainably-sourced building materials, rooftop solar power, and energy efficient systems and operating practices throughout the Terminal  
  • Sustainability certifications for LEED (silver or gold), Envision and SITES underway


About JFK Millennium Partners 
 

Terminal 6 is an award-winning public-private partnership between the Port Authority of New York & New Jersey and JFK Millennium Partners – a consortium that includes Vantage Group, an industry leading investor, developer and manager of award-winning global airport projects, including LaGuardia Airport’s Terminal B; American Triple I, a certified minority-owned investor, owner, developer and manager of infrastructure assets; RXR, an innovative New York real estate investor and developer; and JetBlue Airways, New York’s hometown airline. When complete, Terminal 6 will connect seamlessly with Terminal 5 to create an anchor terminal on JFK International Airport’s north side. For more information, visit https://www.anewjfk.com/jmp-terminal6/  

About Cathay Pacific 

Premium full-service airline Cathay Pacific is the home carrier of Hong Kong, and a founding member of the oneworld global alliance. Cathay also comprises cargo division Cathay Cargo, low-cost carrier HK Express, and its lifestyle business. Cathay is a member of the Swire Group and is listed on the Hong Kong Stock Exchange (HKSE).  

Cathay is a premium travel lifestyle brand that brings together all that we love about travel with everyday lifestyle. The range of products and services includes flights, holidays, shopping, dining, wellness and payment. All our travel lifestyle offerings are designed to bring customers exciting offers, rewards, experiences and hand-picked partners. 

For more than seven decades, Cathay Pacific has been connecting our home city of Hong Kong to the world. Now we’re bringing that connection to more of our customers’ lives. The new era of Cathay elevates their every bite, tap, step, stay and flight to greater heights. www.cathaypacific.com  

 

###

 

JFK Millennium Partners Announces Aer Lingus as Next JFK Terminal 6 Airline

Aer Lingus selects new JFK Terminal 6 for operations beginning in early 2026

FOR IMMEDIATE RELEASE

Contact:

JFK Millennium Partners
Jennifer Janzen
929-625-4216
JJanzen@vantageairportgroup.com

New York and Dublin – May 28, 2024 — JFK Millennium Partners (JMP), the company selected by the Port Authority of New York & New Jersey to build and operate John F. Kennedy International Airport’s new world-class, $4.2 billion Terminal 6, and Aer Lingus today announced that the airline will make Terminal 6 its new home at JFK and begin operations on the first day of the Terminal’s opening to passengers in early 2026. In addition, Aer Lingus will open a new signature lounge in Terminal 6 for its passengers, providing a modern state of the art space with greater seating capacity, ensuring more comfort and space for Aer Lingus customers.

All customers can look forward to the Terminal’s boutique, state-of-the-art design, with short walking distances to and from gates, curated artwork, and 100,000 square feet of NYC-inspired shopping and dining. A new Aer Lingus check-in space will allow for a seamless check-in experience with self-service bag drop options for greater convenience. Aer Lingus customers can enjoy seamless connectivity within the same terminal with connecting partner JetBlue.

Aer Lingus currently operates twice daily nonstop service from JFK Terminal 7 to Dublin, and daily to Shannon, Ireland, as well as daily service to Manchester, England using Airbus A330 and A321LR aircraft. A dedicated Aer Lingus lounge is also currently available to premium passengers at JFK Terminal 7. With US Pre Clearance facilities in Dublin and Shannon, Aer Lingus passengers using the Dublin-JFK and Shannon-JFK flights clear US immigration and customs inspections before boarding the flight to JFK, facilitating an easy exit from the airport on arrival.

“We’ve enjoyed a close partnership with Aer Lingus since they moved to JFK Terminal 7 in April 2023, and we’re thrilled to continue this partnership at the new T6 and welcome their passengers on our very first day of operations in early 2026,” said Steve Thody, CEO, JFK Millennium Partners.

‘’We are looking forward to our move to JFK Terminal 6 when construction is completed,’’ said Susanne Carberry, Aer Lingus Chief Customer Officer. ‘’The new terminal promises Aer Lingus customers a modern, light filled, tech enabled space, which will allow us to go above and beyond for our customers. The addition of a brand-new dedicated Aer Lingus lounge will further enhance our loyal customer’s experience providing them with a modern state of the art lounge.’’

/Ends

About JFK Terminal 6

Currently under construction at John F. Kennedy International Airport, and part of the Port Authority of New York & New Jersey’s $19 billion redevelopment of JFK airport, Terminal 6 is being developed in two phases, with the first five gates opening in early 2026 and construction completion expected by 2028. New York City-inspired retail, dining options and amenities totaling nearly 100,000 square feet will create a unique New York sense of place. Terminal 6 airlines and their passengers can look forward to the latest passenger conveniences, technology and amenities, including:

  • 10 gates, of which nine will accommodate widebody aircraft
  • 5-minute average walking distances from the TSA security screening exit to gates
  • State-of-the-art automated baggage system, customs/border control facilities, and the latest TSA screening technologies
  • One of the longest departures curbs at JFK, with airline-branded passenger drop-off zones
  • Up to five airline lounges, in addition to a new arrivals lounge
  • Digital concierge services
  • A curated collection of New York City-inspired artwork featuring local and international artists, curated by the Public Art Fund in partnership with JMP and the Port Authority of New York & New Jersey
  • Sustainably-sourced building materials, rooftop solar power, and energy efficient systems and operating practices throughout Terminal 6
  • Sustainability certifications for LEED (Silver or Gold), Envision and SITES underway
  • A new ground transportation center

About JFK Millennium Partners

Terminal 6 is an award-winning public-private partnership between the Port Authority of New York & New Jersey and JFK Millennium Partners (JMP) – a consortium that includes Vantage Airport Group, an industry leading investor, developer and manager of award-winning global airport projects, including LaGuardia Airport’s Terminal B; American Triple I, a certified minority-owned investor, owner, developer and manager of infrastructure assets; RXR, an innovative New York real estate investor and developer; and JetBlue Airways. As part of its agreement with the Port Authority, JMP also currently manages JFK Terminal 7, which will be demolished in 2026 when the second phase of Terminal 6 construction begins. For more information, visit https://www.anewjfk.com/jmp-terminal6/

About Aer Lingus

Aer Lingus was founded in 1936. Aer Lingus operates over 100 routes from Dublin, Cork, Shannon and Knock to Europe, the UK and North America. Reaffirming its commitment to its North American expansion, the airline will operate 19 transatlantic routes in 2024 from Dublin and Shannon and a further three transatlantic routes from Manchester, UK to North America and the Caribbean.

Aer Lingus is a 4-star airline, awarded by Skytrax, the international air transport rating organisation. Aer Lingus is a member of International Airlines Group (IAG), one of the world’s largest airline groups. As part of IAG, Aer Lingus has pledged to achieve net zero carbon emissions by 2050 and has committed to powering 10% of its flights using sustainable aviation fuel (SAF) by 2030.

JFK Millennium Partners Selects Arora to Implement IBM’s renownedMaximo® Enterprise Asset Management Software and Arora ATLAS®Mobile Solutions for JFK Terminal 6

Mobile applications will ensure a digital-led Terminal experience and efficient, world-class operations

New York, NY and Chadds Ford, PA – May 20, 2024 – Arora Engineers (Arora), a leading minorityowned engineering, construction, and asset management firm headquartered in Chadds Ford, Pennsylvania, and JFK Millennium Partners, (JMP), the company selected by the Port Authority of New York & New Jersey to build and operate the new $4.2 billion JFK Terminal 6, (T6) today announced that Arora will implement IBM’s renowned Maximo® Enterprise Asset Management (EAM) software and the Arora ATLAS® suite of mobile products for T6, which is currently under construction in Queens, NY. Arora is leading T6’s fire protection, plumbing, special systems and airfield/airside electrical engineering services as well as supporting the team with master systems integration services for low voltage and IT systems.

Leveraging its extensive involvement in the design of the new, world-class T6 and its accompanying building information management and asset data, Arora will create a centralized repository of asset information, enabling JMP to execute cross-functional operational tasks with ease. From work order management and scheduling to planning and inventory management, Arora’s technology solutions will optimize the Terminal’s performance, extend asset lifecycles, and reduce downtime and costs, resulting in a more streamlined, safe, and digital-led passenger experience.

“Arora is thrilled to be a part of the lifecycle of this critical gateway to the region, from leading design and construction services to providing asset management and mobility services at JFK Terminal 6, we could not be more excited to work with Steve Thody and his team on this impactful project” said Manik Arora, President & CEO of Arora Engineers. “Our expertise in engineering and asset management, coupled with our commitment to leveraging cutting-edge technology, will enable us to deliver a world-class solution that meets the evolving needs of terminal operators and passengers alike.”

“We are excited to partner with Arora Engineers on the implementation of Maximo EAM software and the Arora ATLAS mobile tools to better manage JFK Terminal 6 operations,” said Steve Thody, CEO, JFK Millennium Partners. “Their proven track record and innovative approach make them the ideal choice to help us realize our vision of creating a digital-first Terminal. Using the Atlas request module, for example, all T6 employees can quickly address any issues that may arise to keep T6 running at optimal performance, thereby improving our passengers’ experience,” Thody added.

The Terminal 6 Redevelopment Project is part of the Port Authority’s historic $19 billion redevelopment initiative, transforming JFK International Airport into a 21st-century global gateway.

With Arora Engineers at the helm of asset management, T6 is poised to become a benchmark for excellence in airport infrastructure.

About Arora Engineers:

Arora is a second-generation, minority-owned family business headquartered in Chadds Ford, PA. As one of the region’s largest MBE-certified engineering, construction, and asset management firms, Arora specializes in overseeing the design, construction, and maintenance of critical infrastructure, with a focus on airports and transportation systems. With a commitment to leveraging the latest digital technologies, Arora is dedicated to improving the quality of life by Rethinking Infrastructure® and has a proven track record of success in delivering world-class solutions, including over a decade of continuous experience working with the Port Authority of New York and New Jersey (PANYNJ) and their partners on redevelopment projects.

About JFK Millennium Partners:

Terminal 6 is an award-winning public-private partnership between the Port Authority of New York and New Jersey and JFK Millennium Partners – a consortium that includes Vantage Airport Group, an industry leading investor, developer and manager of award-winning global airport projects, including LaGuardia Airport’s Terminal B; American Triple I, a certified minority-owned investor, owner, developer and manager of infrastructure assets; RXR, an innovative New York real estate investor and developer; and JetBlue Airways, New York’s hometown airline. When complete, Terminal 6 will connect seamlessly with Terminal 5 to create an anchor terminal on JFK International Airport’s north side. For more information, visit anewjfk.com/jmp-terminal6/

###

Media Contacts:

Jennifer Janzen, JFK Millennium Partners, 929-625-4216, jjanzen@vantageairportgroup.com

Christyn Binder, Arora Engineers, 610-459-7929, cbinder@aroraengineers.com

JFK Millennium Partners Marks 1 Year Since Kicking Off Its Redevelopment Of JFK Terminal 6

QNS

It’s been one year since the start of the $4.2 billion development of JFK Terminal 6.

The massive project is a part of The Port Authority’s whopping $19 billion JFK Vision Plan to reimagine JFK International Airport.

Exciting Details Emerge About JFK’s Newest Terminal, Home To Lufthansa, JetBlue

The Points Guy

A major transformation is underway at New York’s John F. Kennedy International Airport (JFK).

The airport, which is among the busiest in the world, is getting two brand-new terminals, as well as an overhaul of several other existing terminals.

VIDEO: JFK Airport Reveals Renderings Of US$4.2bn Terminal 6, Ahead Of 2026 Opening

Passenger Terminal Today

The Port Authority of New York and New Jersey (PANYNJ) has released an animated rendering of Terminal 6 from terminal frontage to gate, ahead of the opening of the US$4.2bn building in 2026.